Our services:
We are THE experts when it comes to electrical protection
Protection Technology
- Our engineers can check and parameterise the block protection for power plants >500MW and then connect them to the grid after the first start-up.
- We have completely tested 110kV busbar protection systems on a regular basis during ongoing operations.
- In the 380 kV transmission grid, we have gained testing experience in the new eastern federal states and Hamburg.
- Switching capability up to 380kV
- Work under voltage training for installation systems, switchgear and instrumentation and control systems
- We prepare setting sheets and selectivity calculations
- 24/7 On-call troubleshooting service
- Experience with IEC 61850 and IEC 60870-5-103 system integration
- Testing and readjustment of electro-mechanical protective devices
Equipment for:- Primary testing
- Secondary testing
- Transformer testing (accuracy class up to 0,1)
- 400V testing
- 61850 Sniffer and Simulator
Secondary Planning
- Planning of control cabinets and niches
- Incorporation of neccesary revisions
- Manufacturer-independent device selection
- Software licenses for:
- Ruplan
- Elcad
Commissioning
Typical activities during the commissioning of generators / transformers and switchgears are:
- Checking the parts list, terminal and circuit diagrams
- Terminal checks
- Insulation tests for secondary cables
- Testing of circuit breakers, loop measurements
- Phase control
- Function test for all controls, measurements, signals and feedback signals
- Testing of the protective devices
- Checking of the control / locking system
- Transmission ratio and load measurement for current and voltage transformers
- Preparation of work schedules
- Short-circuit and voltage tests
- Equipment for:
- Primary testing
- Secondary testing
- Transformer testing (accuracy class up to 0,1)
- 400V testing
- 61850 Sniffer and Simulator